top of page
SAPULPA HIGH SCHOOL BAND ROOM RENOVATIONS
Sapulpa, OK
1/5
YEAR COMPLETED: 2018
PROJECT STATEMENT: Our design team delivered a sweeping renovation of Sapulpa (OK) High School’s George C. Brite Band Hall. This project, installed by D.C. Bass & Sons Construction, remodeled four interior rooms and redressed the 22-year-old building’s interior walls and floor with new paint, carpet, and tiles. The renovation gave the band program two new locker rooms and a larger student break room. Two rooms in a neighboring building also were combined under this project to provide the band program a practice room for small groups. “The renovations to our band facility surpassed my expectations,” said Craig Amendt, coordinator of instrumental music for Sapulpa Public Schools. “The redesign of the interior of our current facility allowed us much better use of our space. The students enjoy the new break room and dressing rooms. The third band room has given us the space that we have needed for our program.”
bottom of page